How Long Does A Bathroom Remodel Take?
Are you planning a bathroom remodel?
You may be wondering how long the project will take. The answer depends on several factors, including the size of the bathroom, the scope of the renovation, and whether you're hiring professionals or doing it yourself.
In general, a standard bathroom remodel can take between 3 to 5 weeks, while larger renovations can take 6 to 10 weeks.
To help you understand the timeline of a bathroom remodel, let's break down the project into three phases.
How Long Does A Bathroom Remodel Take?
In general, a standard bathroom remodel can take between 3 to 4 weeks. Larger bathroom remodels can take 6 to 12 weeks. The answer to this question is based on many factors, including the number of contractors working on the project, the size of the room, and whether or not you are hiring professionals or doing a DIY job.
Bathroom remodeling projects can be broken down into 3 phases.
Phase 1: Pre-Construction (3-5 Weeks)
The pre-construction phase includes all the initial planning and organization that happens before construction begins:
Job Posting: Post your job online so that contractors can bid on it. The posting should include the scope of work, time frame, budget, and photos of the current space.
Scheduling Site Visits and Bidding: Once you've posted the job, start scheduling site visits and bids from potential contractors.
Picking the Right Contractor: Choose the contractor who best fits your needs based on credibility, budget, and timeline.
Signing the Contract: Make sure all details of the scope of work, materials, and timeline expectations are clearly outlined in the contract.
Getting Permits: Depending on the scope of the project and location, you may need permits. Research local codes and find out if you need any permits before starting your renovation. Top-tier contractors should handle the permit process for you.
Material Purchase: Select quality materials for flooring, fixtures, walls, and more. Doing your homework ahead of time can also help you discover bathroom remodeling ideas that will take your new bathroom design to another level.
Phase 2: Construction (3-6 Weeks)
The construction phase includes all the steps that happen while the renovation is underway.
Bathroom Demolition: Enlist professional help to ensure safety, accuracy, and a strong foundation for later stages in your bathroom remodel.
Electrical and Plumbing: Relocate wiring and switches, replace outlets, and add new lights or features. Plumbing tasks such as relocating plumbing or installing new fixtures for your shower or sink also need to be done.
Insulation: Install insulation to reduce noise and improve energy efficiency, leading to lower energy bills. Choose the best type of insulation for your needs and use a qualified contractor with experience installing insulation in bathrooms.
Drywall and Painting: Drywall provides a strong, level surface that can hold the tile, provide insulation, and protect against moisture. Painting helps make your bathroom look fantastic and acts as a sealant to help protect it from potential damage due to humidity or water splashes.
Inspection: The city will need to inspect your bathroom to ensure it is up to code. If the work is not up to code, work must be halted until the issue is rectified. If the work is up to code, the permit will be signed off, and work can continue. The inspector’s availability can extend the timeline.
Structure and Flooring: Add extra space for sinks or showers, and choose the flooring material that suits your needs.
Vanity, Toilet, Shower, and Bath Installation: Ensure all components fit within your allotted space and match up with any existing plumbing in your home.
Tile work: This step requires a lot of prep work and drying time, which is why tiling often takes two to five days to complete.
Adding Cabinets and Trim: Cabinets provide additional storage for toiletries and other bathroom essentials, and trim adds a finishing touch
Finishing Touches: Once the renovation is complete, the hardware and personal touches can be added to the bathroom. Installing shower curtains, toilet paper holders, mirrors, lights, and rugs can all be done in this final phase.
Phase 3: Post-Construction (4-8 Days)
After the renovation is complete, it's important to review the work with your contractor to ensure it meets your expectations.
Walkthrough: A walkthrough with the contractor is essential to inspect the fittings and fixtures and ensure they're anchored properly with caulking and sealants applied around them. This step is also an opportunity for the contractor to address any issues that need further attention.
Touch ups: If any changes or touch ups need to be made after the contractor walkthrough, they should be resolved in this step. It's important to repeat the walkthrough step until you're satisfied with the results.
Final Inspection and Final Payment: Once all requested changes have been made, the contractor should perform one last inspection. Both you and the contractor should sign off on the final inspection and then settle any outstanding balance with the contractor.
Enjoy: Once the payment is made, your newly renovated bathroom is officially complete.
Factors Affecting the Timeline of a Bathroom Remodel
The timeline of a successful bathroom remodel is influenced by various factors, including the level of work required. The more damages or outdated materials in the current space, the longer it may take to complete the project. Below are other factors that can affect the timeline of a bathroom remodel.
What Impacts The Timeline Of A Bathroom Remodel
The element that takes the longest during a bathroom remodel project depends on the specific work being done. However, bathroom tile work typically takes a significant amount of time. Depending on the project's size and complexity, tile installation alone can take several days to a few weeks. Electrical or plumbing work can also be time-consuming and may require a specialized subcontractor, resulting in more time needed to complete the project. Additionally, replacing the bathroom flooring is another aspect that can take significant time.
Current Condition of the Bathroom
The condition of the existing bathroom can significantly impact how long the project takes to finish. If the walls and floors need replacement, it could take significantly longer than if only repainting and refreshing the existing features. Similarly, the state of the existing fixtures and finishes can drastically impact the renovation timeline, depending on the materials in use and the scope of work required. Being aware of any preexisting issues can help better plan the timeline expectations.
Material Gathering
Lead times associated with ordering materials should be considered when estimating the project timeline. If ordering materials online or from out-of-town locations, be sure to factor in shipping or delivery times.
Permits
Permits are typically necessary when changing bathroom plumbing or wiring. If changes occur without a permit, it can lead to fines. Hence, always check for the necessary permits, which may require extra paperwork, inspections, and fees that factor into the renovation timeline. Getting necessary approvals can help avoid costly delays.
DIY vs. Professional Job
Deciding between a DIY or hiring a professional contractor can affect the renovation timeline. Hiring a professional contractor can speed up the process and result in a quicker turnaround time than DIY projects. Although it may cost more upfront, a realistic timeline and finished product sooner are often worth it in the long run. Finding the right contractor can help achieve the desired quick turnaround.
Build Your Dream Bathroom With Austin Dream Kitchens
If you need help or want to leave it to the professionals, our team is here to help. We specialize in helping homeowners plan and execute their vision for the perfect bathroom.
Fill out our contact form today, and someone from our team will be in touch soon.